The main difference between the production process of clad copper and copper water pipe lies in the addition of the plasticized layer and the production process.
The production process of cladding copper pipe is as follows:
Purchase high-purity copper materials, after surface treatment, start the material.
After heating, extruding, drawing and other processes, the copper material will be made into standard size copper pipe.



After the copper tube is cleaned, dried and other treatments, the plastic is wrapped around the surface of the copper tube to form a plastic-covered layer.
After the pressure test, waterproof test and other tests, plastic-coated copper pipe products into the packaging process, packaging and sales to the market. The production process of copper water pipe is as follows:
Purchase high-purity copper materials, after surface treatment, start the material.
After heating, extruding, drawing and other multi-processes, the copper material is made into standard size copper pipe.
After cleaning, drying and other treatments, the copper water pipe products enter the packaging process, and after packaging, they are sent to the market for sale. In summary, the main difference between plasticized copper and copper water pipe production process is the addition of plasticized layer and production process. Plastic-coated copper pipe in the surface of the copper pipe to add a layer of plastic cladding, in order to enhance the corrosion resistance and waterproof performance of the copper pipe. The copper water pipe does not need to add plastic coating, only after processing, cleaning, drying and other treatments can be made, the production process is relatively simple.